Skip to the content
Phone: 0416 337 597
Email: kynan@davisweldandfab.com.au
Services
Contact
logo mainlogo darklogo light
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
HomeProjectMetal Roof Support Beams and Column

Metal Roof Support Beams and Column

Davis Welding and Fabrication was contracted to manufacture and install metal roof support beams and a column, as part of a renovation at a Gold Coast luxury penthouse apartment.

 

Client:

 

Gold Coast Luxury Penthouse Apartment

 

Project description:

 

The client wanted to remove multiple walls to create a more contemporary open-plan living space to maximise their ocean views. Customised metal roof support beams and columns were selected to fulfil the structural and load-bearing requirements.

 

What were the challenges?

 

The worksite was on the 14th floor of an apartment building, The steel beams were as much as 90kg per metre with lengths up to 7m. Getting a 630kg beam into an apartment building is no easy feat.

Beams would usually be completely pre fabricated at our Bethania workshop. However, due to the size and weight of this project, we had to lift sections into the apartment in sections and join them in situ.

Once the beams were in the apartment and fully fabricated, we had to raise the 630kg beams into position against the ceiling slab.

The column and mounting plates had to be in specific heights and locations for the beams to fit correctly.

 

How did Davis Welding and Fabrication solve these challenges?   

 

The beams were lifted on the outside of the building in partial sections using a rooftop gantry and were guided by riggers on a Swinging Stage.

Beam sections were trimmed on site, extra material was allowed in case the location needed to change due to walls being cut out for the installation. Once prepared, the corresponding beams were welded together using a Low Hydrogen MMAW welding process.

While the beams were being welded, the positions of the mounting bracket were carefully measured. Once the position of the bracket was confirmed we used our heavy duty hammer drill to drill 24mm holes into the concrete walls at depths determined by the Engineer. We then filled the holes with 501 Epoxy Chemset and inserted the 20mm threaded studs.

To lift the beams into the final location we partially lifted the beams with 2 chain blocks fixed to the ceiling, then positioned two material hoists underneath them. Once the load was taken by the Material hoists the Chain blocks were removed and the Beams were lifted into its final position against the ceiling slab and bolted to the column and wall bracket

 

Project result

 

The Beams were lifted into the building in a safe manner, fabricated to all engineering specifications, and positioned to take the load of the ceiling so that multiple walls could be removed creating a beautiful open floor plan in a Luxury Apartment overlooking the ocean.

 

Category:
Project
Date:

September 4, 2024

Share:
Food processing plant stainless steel boot wash platform. Prev Metal Rockfall Protection Drill Rig – Repair Next

Davis Welding & Fabrication

Design, manufacture, and installation of specialist commercial metal fabrications and solutions. Servicing Brisbane, Gold Coast, and inner Southeast Queensland.

Quick Links
  • HOME
  • ABOUT
  • SERVICES
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • CONTACT
  • Privacy Policy
  • Terms of Service
Email

kynan@davisweldandfab.com.au

Phone

0416 337 597

Copyright © 2025 Davis Welding & Fabrication, all rights reserved | Website by Success Marketing

TALK TO US ABOUT
YOUR PROJECT

OFFICE HOURS

Office hours: 5:00am – 2:00pm
Hours of service operations: 7 days a week as required.

LOCATION

26 Horizon Drive,
Beenleigh QLD 4207

EMAIL

kynan@davisweldandfab.com.au

PHONE

0416 337 597