Skip to the content
Phone: 0416 337 597
Email: kynan@davisweldandfab.com.au
Services
Contact
logo mainlogo darklogo light
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
HomeProject 2Food processing conveyor modifications

Food processing conveyor modifications

Client: Food Processing Plant, Brisbane

 

Project description:

Stainless steel food processing conveyor modifications. A major Brisbane-based food processor engages Davis Welding & Fabrication to handle much of their stainless steel welding and fabrication requirements. We were engaged to modify 15m of conveyor reducing the width from the existing 1020mm wide to 750mm wide for operational reasons. 

 

What were the challenges?

The work needed to be completed over a two day weekend to eliminate operational downtime. 

 

How did Davis Welding and Fabrication solve these challenges?  

The task was planned carefully so any components that could be prepared earlier were ready prior to the job taking place. These parts included the drive shafts, the idle shafts, return roller shafts and leg cross braces.

 

A procedure was written prior to commencement, with tasks allocated to each team member. The procedure was discussed with the team prior to the job starting, so that everyone had a clear understanding of what they needed to do.

 

 

Project result

Careful preparation and a clear plan on the day resulted in the job running smoothly and to schedule. The client was surprised how quickly and efficiently the task was completed.

Category:
Project 2
Date:

December 16, 2023

Share:
Galvanised steel material handling platform Prev Galvanised Steel Structure Replacement Next

Davis Welding & Fabrication

Design, manufacture, and installation of specialist commercial metal fabrications and solutions. Servicing Brisbane, Gold Coast, and inner Southeast Queensland.

Quick Links
  • HOME
  • ABOUT
  • SERVICES
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • CONTACT
  • Privacy Policy
  • Terms of Service
Email

kynan@davisweldandfab.com.au

Phone

0416 337 597

Copyright © 2025 Davis Welding & Fabrication, all rights reserved | Website by Success Marketing

TALK TO US ABOUT
YOUR PROJECT

OFFICE HOURS

Office hours: 5:00am – 2:00pm
Hours of service operations: 7 days a week as required.

LOCATION

26 Horizon Drive,
Beenleigh QLD 4207

EMAIL

kynan@davisweldandfab.com.au

PHONE

0416 337 597