Skip to the content
Phone: 0416 337 597
Email: kynan@davisweldandfab.com.au
Services
Contact
logo mainlogo darklogo light
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
logo main
  • HOME
  • ABOUT
  • SERVICES
    • Welding and Fabrication Brisbane
    • Commercial Welding
    • Food and Beverage Processors
    • Commercial Boilermaker Services
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • BLOG
  • CONTACT
HomeProject 2Conveyor Drum Replacement

Conveyor Drum Replacement

Client:

Food Processing Plant, Brisbane

 

Project description:

Replace large stainless steel conveyor drum assembly.

A major Brisbane-based food manufacturer required replacement of a large stainless steel conveyor drum assembly.  Our Brisbane metal fabrication services were commissioned to manage the entire project on a tight timeframe.

 

What were the challenges?

  • The installation had to be completed over one weekend to ensure no loss of productivity.
  • Careful measurements needed to be taken of the drum so all metal fabrication could be handled prior to installation at our Brisbane based workshop.
  • Access to the drum was heavily restricted by other machinery.
  • There was limited anchor points above to attach lifting equipment

 

How did Davis Welding and Fabrication solve these challenges?   

  • Meticulous planning was essential to ensure the replacement drum was manufactured correctly
  • Disassembly of the surrounding machinery was required to gain access to the drum
  • Careful rigging from above allowed us to lift the old drum out and the new drum in.

 

Project result

  • Our planning paid off as the drum was swapped and the conveyor reassembled in one day. This was a great result as it allowed us plenty of time to thoroughly test the conveyor before it was put back into service the following week.
  • No loss of productivity was therefore experienced by our highly satisfied client.

 

Category:
Project 2
Date:

October 13, 2023

Share:
IKEA Handrail Modification Prev Stainless steel and galvanised handrails, gates and steps Next

Davis Welding & Fabrication

Design, manufacture, and installation of specialist commercial metal fabrications and solutions. Servicing Brisbane, Gold Coast, and inner Southeast Queensland.

Quick Links
  • HOME
  • ABOUT
  • SERVICES
    • Galvanized Steel Concrete Reinforcements
  • PROJECTS
  • CONTACT
  • Privacy Policy
  • Terms of Service
Email

kynan@davisweldandfab.com.au

Phone

0416 337 597

Copyright © 2025 Davis Welding & Fabrication, all rights reserved | Website by Success Marketing

TALK TO US ABOUT
YOUR PROJECT

OFFICE HOURS

Office hours: 5:00am – 2:00pm
Hours of service operations: 7 days a week as required.

LOCATION

26 Horizon Drive,
Beenleigh QLD 4207

EMAIL

kynan@davisweldandfab.com.au

PHONE

0416 337 597